CDC BUS DEPOT OAKLEIGH
Bascon Group delivered DC fast charging for CDC Oakleigh. The project required the BASCON team to install the Kempower power unit and satellites. The works included installing and commissioning harmonic balancing to ensure that the newly install units caused minimum impact and inference with the existing infrastructure.
Services provideD
Project Management
Solar Power Design
Solar Power Installation
Solar Generation Optimisation